McLaughlin Drive Traffic Advisory

March 25, 2020

What:

Weather permitting, the campus will be using non-destructive methods at eleven (11) locations on McLaughlin Drive to expose and identify buried utilities. The potholes will then be paved back with sand bedding and cover, lean concrete slurry, aggregate base and hot mix asphalt once buried utilities are identified. See map of affected location.

Traffic control will be used/in place with one lane of traffic to remain open at all times. There may be possible wait times of up to 5 minutes.

This work may result in temporary closure(s) of the westbound Science Hill transit stop.

Please be observant and use caution when using this road during scheduled dates.

Scheduled Dates: 

Wednesday, 3/25/2020 through Friday, 4/3/2020

Scheduled Times:

7:00 AM – 5:00 PM

For questions, contact PPDO Project Manager Marc Douvia at (831) 502-8162 or (831) 419-4590.